Homepage • About Us • Current Projects • Completed Projects • Contact Info • Area Links
 27 Berry Patch Lane 
Highlight for Album: Pre Construction Interior
Album: Pre Construction Interior
Changed: 07/11/2006
Contains: 15 items.

Highlight for Album: Construction Underway
Album: Construction Underway
Changed: 07/11/2006
Contains: 9 items.

Highlight for Album: A finished product
Album: A finished product
Changed: 07/11/2006
Contains: 21 items.

We started with a classicly styled cedar salt box cape.
We started with a classicly styled cedar salt box cape.

Humble beginings
Humble beginings

Started with fabulous light and space.
Started with fabulous light and space.

We are somewhere up in the woods off South Hill Road.
We are somewhere up in the woods off South Hill Road.

Originally the front of the house was the back yard...This needed to be changed.
Originally the front of the house was the back yard...This needed to be changed.

A country lane is the new driveway
A country lane is the new driveway

The back yard...gorgious stone walls...privacy...Birches and Maples are brilliant in the Fall.
The back yard...gorgious stone walls...privacy...Birches and Maples are brilliant in the Fall.

This was the deck!
This was the deck!


Powered by Gallery v1
CZ Construction Management, Inc, 19 Pleasant Street, Ludlow, VT • telephone: (802) 228-7530 • fax: (802) 228-8046
Homepage • About Us • Current Projects • Completed Projects • Contact Info • Area Links